Portakabin UKConnect:
Subscribe to me on YouTube
  • CALL: 0190 468 1660

Case Study - Akeley Wood Senior School

Organisation : Akeley Wood Senior School

Application : Education

Product : Ultima

Location : Buckingham

Requirement :

Two weeks before the end of the summer term at Akeley Wood Senior School, an explosion caused by an underground gas leak devastated the science laboratories. The fire occurred during the night, destroying four laboratories and a preparation room.

The school was able to continue the term’s remaining science lessons in existing accommodation, but needed to find a way to get high-quality, fully operational science labs built and ready for lessons, before students returned in the autumn.

Solution :

The architect appointed by the insurance loss adjustor was aware of Portakabin’s excellent reputation in the education sector, and it quickly emerged that Portakabin was the only company able to commit to the tight timescales of the project. Portakabin has a Customer Charter that promises to deliver buildings on time and on budget, and if the company fails to do this, it offers a week’s free hire for every day it is late.
 
Within two days of the explosion, the school was delighted to receive a full initial costing from Portakabin. Working closely with the school, Portakabin selected a suitable location and designed a science block that would meet the school’s precise requirements.

The new block included four laboratories and a preparation room, as well as two storage areas. The building was accessed by a ramp, and fitted with heating and a climate control system, all provided by Portakabin. The company was able to accommodate the specific requirements of a science teaching area by supplying non-slip flooring, acid-resistant worktops, fire-resistant storage facilities and even a secure cupboard for storing radioactive materials.

A timescale was drawn up by Portakabin for delivering, installing and equipping the buildings before the end of the summer holidays. The buildings were duly delivered on the agreed date and were connected to all services and fitted out with everything from sinks to gas taps in time for the arrival of students in September.

Bursar, Clive Martin, says: “I was amazed that Portakabin managed to do so much in such a short timescale. All along I’d had doubts that everything could be completed in time, but I was very impressed by Portakabin’s positive approach to meeting the promised completion date.

“People returning after their holidays were really impressed by the standard of accommodation we had been able to put in place. It was quite a complex project too. Portakabin took care of everything and managed the whole project, which means we now have a very high quality science teaching block to replace the damaged facilities.”



Free Downloads

 
01904681660

© Portakabin 2018  I  Portakabin Limited, Yorkon House, New Lane, Huntington, York, YO32 9PT   I   Tel: 01904681660
Registered company number 685303