624m2 interim GP surgery for 15,000 patients delivered in just 15 days following devastating floods
Healthcare practices across the UK trust Portakabin to deliver the standard of facilities they demand for their patients. Our high-quality healthcare buildings are constructed to meet all healthcare building standards, including HTM (Health Technical Memoranda), HBN (Health Buildings Notes), SHTM (Scottish Health Technical Memoranda) and HAI-SCRIBE (Healthcare Associated Infection System for Controlling Risk in the Built Environment).
Fully fitted surgery buildings delivered fast with minimal disruption to your practice
Whether you need a permanent new practice building or a temporary building to house your surgery during refurbishment works or following a fire or flood, Portakabin can design and build precisely the facilities you require - to meet even the most urgent timescales.Your portable or modular building can include everything you need, from waiting rooms, reception areas and dispensaries to consulting and treatment rooms, offices and secure storage areas.
Why choose GP or dental practice buildings from Portakabin?
|
|
Meeting the demands of GP and dental practices nationwide
Portakabin has delivered a wide range of practice buildings of all sizes to provide permanent or interim healthcare facilities for patients throughout the UK. Take a look at the surgeries we have already delivered for Garlinge Surgery, Kent, Greenhills Surgery, Lanarkshire, Mawsley Village Surgery, Northamptonshire and Medway PCT, Kent.
“Portakabin provided a full turn-key package, which meant we had just one supplier to deal with. Portakabin effectively operated as principal contractor on its own project, managing all aspects of design and construction on our behalf. It made the project much simpler for us to manage.”
Rod Hulme, Technical Services Director“The whole building and all integrated systems were delivered and installed by Portakabin right on schedule and to the agreed budget. We were very pleased with the service provided by Portakabin throughout the project and the client is very happy with the quality of the building and the high standard of facilities it delivers.”
Gavin Walters, Associate Director