Portakabin UKConnect:
Subscribe to me on YouTube
  • CALL: 0190 468 1660

Case Study - Olympic Delivery Authority

Organisation : Olympic Delivery Authority

Application : Offices

Product : Ultima

Location : East London

Requirement :

In preparation for the London 2012 Olympic and Paralympic Games, the Olympic Delivery Authority (ODA) needed to procure a range of different buildings to house the staff responsible for the construction phase of the Olympic Park.

Solution :

Within just eight weeks, Portakabin delivered a three-storey executive workspace, providing 3,577mē of floor area per storey, on time and on budget. The building was equipped with security systems, a lift, access ramps and steps, climate-control and IT equipment. In keeping with the ODA's environmental commitments, Portakabin installed dual-flush toilets and waterless air flush urinals to minimise water use. Energy-conserving solar sheeting was fitted to the building's windows and motion sensors were fitted to the lighting system to reduce the amount of energy consumed.



Free Downloads

 
01904681660

© Portakabin 2018  I  Portakabin Limited, Yorkon House, New Lane, Huntington, York, YO32 9PT   I   Tel: 01904681660
Registered company number 685303